MOQ 50 pcs Lead time 2–3 weeks Full private label Sample before bulk DDP USA & worldwide
Mike Apparel

Request a Sample

Request a pre-production sample from Mike Apparel. Made exactly as bulk in your fabric, size and branding, shipped in 7–10 days. Sample fee credited against your first order.

See the fabric, the stitching and the fit before you commit to a run. A pre-production sample is made exactly as bulk will be, in your fabric, colour, size and branding, and ships to you in 7–10 days plus courier time.

How sampling works

  1. BriefSend the product, size, fabric and artwork.
  2. ConfirmWe confirm fee, fabric and timeline within 24 hours; sample fee paid upfront.
  3. MakePattern, fabric, labels and decoration produced; one complete garment sewn and finished in 7–10 days.
  4. ReviewPhotos on a form first, then the physical sample by courier. One revision included.
  5. ApproveSign off, and the sample fee is credited to your bulk order.

Sample pricing

A sample costs 2–3x the bulk unit price: roughly $25–$45 for a tee, $45–$80 for a hoodie, $90–$180 for a jacket, plus courier at cost ($35–$60 to the USA). The sample fee is credited in full against a bulk order placed within 90 days. Read the full clothing sampling process guide.

What we need

  • Product type and the size you want the sample in
  • Fabric choice or GSM, or the hand feel you want
  • Reference: tech pack, sketch, photos or a link
  • Artwork for print, embroidery and labels (vector preferred)
  • Delivery address

Request a sample

Tell us the product and size. We confirm the sample fee and timeline within 24 hours.

No obligation. Files can be sent by reply email or WhatsApp.

Prefer to start with a quote? Get a quote instead. Curious about the full process? Read how it works.

Last updated September 5, 2026 · Mike Apparel, Sialkot. Pricing and lead times reflect current factory capacity; confirm on your quote.

Start your line

Send the tech pack.
Get a sample in your hands.

Fabric options, MOQ, per-piece pricing and a sample plan within 24 hours. 50-piece minimum, 2–3 weeks after sample approval, DDP to your door.

Get a Quote WhatsApp